# Test Packets User Guide ## What are Test Packets? Test Packets organize your inspection and testing activities into manageable groups. Think of them as folders that contain all the welds, inspections, and documentation for a specific area or system of your project. ## Getting Started To access Test Packets: 1. Login to the system 2. Click on **Test Packets** in the main menu 3. View existing packets or create new ones ## Understanding Test Packets ### What's in a Test Packet? Each packet typically contains: - **Welded joints** ready for inspection - **NDT requirements** (RT, UT, PT, MT, etc.) - **Pressure test information** - **Documentation requirements** - **Sign-off tracking** ### Packet Organization Packets are usually organized by: - **System numbers** (cooling water, steam, etc.) - **Work areas** (Unit 1, Battery A, etc.) - **Construction phases** (Phase 1, Phase 2, etc.) - **Test pressure levels** (same pressure = same packet) ## Creating a New Test Packet ### Basic Setup 1. Click **"Create New Packet"** 2. Fill in essential information: - **Packet Number**: Unique identifier (often auto-generated) - **System/Area**: Which part of the plant - **Test Pressure**: Required test pressure - **Target Date**: When testing should be completed ### Adding Welds to Packet **Manual Addition:** 1. Click **"Add Welds"** in the packet 2. Search for welds by: - ISO number - Line number - Joint number - Date range 3. Select welds and click **"Add to Packet"** **Bulk Addition:** 1. Use **"Import from Weldmap"** feature 2. Set criteria (area, date range, etc.) 3. System automatically adds matching welds 4. Review and confirm selections ## Managing Packet Contents ### Viewing Packet Details - **Weld List**: All joints included in packet - **NDT Summary**: Required inspections by type - **Progress Tracking**: Completed vs remaining work - **Status Overview**: Overall packet completion ### NDT Planning The system automatically calculates: - **RT Requirements**: Based on code requirements - **UT Needs**: Ultrasonic testing assignments - **Surface Testing**: PT/MT requirements - **PMI Checks**: Material verification needs ### Progress Tracking Monitor completion by: - **Individual weld status** (complete/pending) - **NDT type completion** (RT 85%, UT 60%, etc.) - **Overall packet progress** (ready for pressure test?) - **Documentation status** (certificates received?) ## NDT Coordination ### Requesting Inspections 1. **Select NDT type** needed (RT, UT, PT, MT) 2. **Choose inspection company** from approved list 3. **Set priority level** (normal, urgent, hold) 4. **Add special instructions** if needed 5. **Submit request** to NDT coordinator ### Tracking NDT Results When results come back: 1. **Update test results** in the system 2. **Upload reports** (PDF format) 3. **Mark accept/reject** status 4. **Add repair recommendations** if needed ### Managing Repairs For rejected welds: 1. **Create repair work order** 2. **Assign to welding crew** 3. **Track repair completion** 4. **Schedule re-inspection** 5. **Update packet status** ## Pressure Testing ### Pre-Test Requirements Before pressure testing, verify: - ✅ All welds completed and accepted - ✅ NDT requirements satisfied - ✅ Temporary supports installed - ✅ Safety permits obtained - ✅ Test equipment ready ### Test Execution 1. **Create test record** in the packet 2. **Record test pressure** and duration 3. **Document any leaks** or issues found 4. **Update test status** (pass/fail) 5. **Upload test certificates** ### Post-Test Activities After successful test: - **Remove temporary supports** - **Update packet to "Tested" status - **Prepare handover documentation** - **Schedule final inspections** ## Documentation Management ### Required Documents Each packet needs: - **Weld maps** with joint locations - **NDT reports** for all inspections - **Material certificates** for all components - **Pressure test certificates** - **As-built drawings** if changes made ### Document Upload 1. **Click "Documents" tab** in packet 2. **Select document type** from dropdown 3. **Upload files** (PDF preferred) 4. **Add descriptions** and dates 5. **Mark as approved** when reviewed ### Document Review Track document status: - **Submitted**: Uploaded but not reviewed - **Under Review**: Being checked by QC - **Approved**: Accepted for handover - **Rejected**: Needs corrections ## Handover Process ### Preparing for Handover 1. **Complete all testing** requirements 2. **Gather all documentation** 3. **Verify no open NCRs** (Non-Conformance Reports) 4. **Get QC final approval** 5. **Prepare handover package** ### Handover Documentation Package should include: - **Test packet summary** - **Complete weld list** with acceptance - **All NDT reports** - **Pressure test certificates** - **Material traceability** - **As-built drawings** ### System Handover Final steps: 1. **Mark packet as "Ready for Handover"** 2. **Get client approval** (if required) 3. **Transfer to operations** team 4. **Update system status** to "Handed Over" 5. **Archive documentation** ## Common Tasks ### Daily Packet Review 1. **Check progress** on active packets 2. **Review NDT results** received 3. **Update completion status** 4. **Plan next day's activities** 5. **Coordinate with inspection teams** ### Weekly Planning 1. **Review upcoming deadlines** 2. **Plan NDT scheduling** for next week 3. **Check resource availability** 4. **Update progress reports** 5. **Coordinate with other departments** ### Monthly Reporting 1. **Generate completion reports** 2. **Analyze productivity trends** 3. **Review quality metrics** 4. **Plan resource adjustments** 5. **Update project schedules** ## Working with Teams ### NDT Coordinators - **Submit requests** early for better scheduling - **Provide clear access** requirements - **Communicate urgency** levels clearly - **Follow up** on pending results ### Construction Teams - **Coordinate completion** schedules - **Communicate test requirements** early - **Plan access** for inspections - **Report completion** promptly ### QC Department - **Review documentation** thoroughly - **Escalate issues** quickly - **Maintain standards** consistently - **Support resolution** efforts ## Troubleshooting ### Common Issues **Packet won't close:** - Check for incomplete NDT - Verify all documentation uploaded - Look for open NCRs - Confirm all approvals received **Can't add welds to packet:** - Check weld completion status - Verify no conflicts with other packets - Ensure weld meets packet criteria - Contact admin if system error **Missing NDT reports:** - Check with inspection company - Verify report upload location - Look in other related packets - Contact NDT coordinator ### Quick Solutions - **Use search function** to find missing items - **Check filter settings** if data missing - **Refresh page** for latest updates - **Contact supervisor** for process issues ## Best Practices ### Planning - ✅ Start packets early in construction phase - ✅ Group logically by system/area - ✅ Plan NDT scheduling in advance - ✅ Coordinate with all stakeholders ### Execution - ✅ Update status promptly - ✅ Upload documents immediately - ✅ Communicate issues quickly - ✅ Follow established procedures ### Quality - ✅ Review all documentation thoroughly - ✅ Maintain complete traceability - ✅ Follow approval processes - ✅ Keep detailed records ## Getting Help **For Process Questions:** - Review project procedures - Consult QC supervisor - Check industry standards - Ask experienced team members **For System Issues:** - Try refresh/restart first - Note specific error messages - Contact IT support - Provide packet numbers for reference Remember: Test Packets are your roadmap to successful system completion. Good organization here makes handover smooth and trouble-free!