78 lines
2.6 KiB
Markdown
78 lines
2.6 KiB
Markdown
# PMI Log User Guide
|
|
|
|
## What is the PMI Log Module?
|
|
|
|
The PMI Log module tracks and documents Positive Material Identification (PMI) testing activities and results. This module helps ensure proper material identification, monitor PMI testing quality, and maintain quality control records for various project components.
|
|
|
|
## Getting Started
|
|
|
|
To access PMI Log:
|
|
1. Login to the system
|
|
2. Click on **NDT** in the main menu
|
|
3. Select **PMI Log** from the submenu
|
|
|
|
## Key Features
|
|
|
|
### Primary Functions
|
|
- **PMI Testing Logging**: Record PMI testing activities and results
|
|
- **Quality Control**: Monitor PMI testing compliance and standards
|
|
- **Data Analysis**: Analyze PMI testing trends and patterns
|
|
- **Report Generation**: Generate PMI testing reports
|
|
|
|
### Secondary Functions
|
|
- **Equipment Management**: Track PMI equipment calibration and maintenance
|
|
- **Operator Management**: Manage qualified PMI testing operators
|
|
- **Documentation**: Maintain PMI testing records and procedures
|
|
- **Alert System**: Alert when material composition is out of specification
|
|
|
|
## How to Use
|
|
|
|
### Recording PMI Tests
|
|
1. Click **"New PMI Test"** button
|
|
2. Select the material or component to test
|
|
3. Choose PMI testing method and technique
|
|
4. Enter test conditions and parameters
|
|
5. Record test results and findings
|
|
6. Add test observations and comments
|
|
7. Save test record
|
|
|
|
### Quality Control Process
|
|
1. Review PMI testing specifications
|
|
2. Verify equipment calibration status
|
|
3. Check operator qualifications
|
|
4. Monitor testing accuracy and repeatability
|
|
5. Document any deviations or issues
|
|
6. Take corrective action if needed
|
|
|
|
### Testing Categories
|
|
- **Base Materials**: PMI testing of base materials
|
|
- **Welded Joints**: PMI testing of welded joints
|
|
- **Components**: PMI testing of various components
|
|
- **Special Applications**: Critical PMI testing requirements
|
|
|
|
## Best Practices
|
|
|
|
### Usage Guidelines
|
|
- ✅ Always calibrate equipment before testing
|
|
- ✅ Follow proper PMI testing procedures and standards
|
|
- ✅ Document test conditions accurately
|
|
- ✅ Verify operator qualifications
|
|
|
|
### Quality Assurance
|
|
- ✅ Check equipment calibration regularly
|
|
- ✅ Verify testing accuracy and repeatability
|
|
- ✅ Monitor PMI testing trends and patterns
|
|
- ✅ Document any testing issues or deviations
|
|
|
|
## Troubleshooting
|
|
|
|
### Common Issues
|
|
1. **Testing errors**: Check equipment calibration and procedure
|
|
2. **Material composition issues**: Review material specifications
|
|
3. **Equipment malfunction**: Contact equipment maintenance
|
|
|
|
### Getting Help
|
|
- Contact the NDT department for technical support
|
|
- Consult PMI testing procedures and standards
|
|
- Check equipment calibration records
|